+974 4460 0235
aaes@aaes.net

Contact Information

Street 21, New Industrial Area, Doha, Qatar


+974 4460 0235


+974 4460 0237


aaes@aaes.net


www.aaes.net


View Catalogue

Our Location

Menu
Menu

Our Projects

Mesaimeer Road Project (P008 C3) – Stormwater System Modification

MEI Contracting
Client: Ashghal
Main Contractor: CCC

This project involved stormwater drainage system modifications across three underpass pumping stations along Mesaimeer Road. The scope included mechanical installations, electrical systems, control panels, and testing. The modifications improved flood management capacity and system responsiveness during heavy rainfall events. Strict safety and quality procedures were followed throughout execution. The upgraded system enhanced operational resilience and public safety in a critical transport corridor.

Our Projects

Seawater Pump Service & Repair | AAES

Our Pump Service Department specializes in the servicing and repair of high-capacity seawater pumps, delivering precision, safety, and technical expertise at every stage. Through comprehensive service procedures, we... (Read more)

Roads Improvement Works in North Area – Phase 5, Package 3

This project forms part of Ashghal’s strategic program to upgrade road infrastructure in the northern areas of Qatar, with a strong focus on reliability, safety, and long-term operational... (Read more)

Design & Construction of Al Bustan Street North (P007 C7 P2)

This project involves the design and construction works for Al Bustan Street North, a critical infrastructure corridor supporting traffic flow and urban development. Abu Adel Engineering & Mechanical... (Read more)

linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram