This pilot project involves the replacement of a 25 MVA, 66/11 kV power transformer at Al Sulaimi Substation to enhance system reliability and operational efficiency. The scope covers safe dismantling of the existing transformer, installation of the new unit, and full integration with the substation’s protection and control systems. All works will be executed in accordance with Kahramaa standards, approved procedures, and applicable safety regulations. Upon completion, comprehensive testing and commissioning will be conducted to ensure optimal performance and long-term operational stability.